Multiple factories across different states required support, each with its own brand control systems. Production goals required an intense work schedule to achieve the desired results.
Cybertrol provided support for a variety of applications, including:
After six months of intense triage engineering at 60-plus hours per week and several weekends, workcell operations were improved and the customer no longer required Cybertrol’s support.