Relocated legacy equipment was undocumented and required new control hardware. Safety upgrades were needed on filling and sealing equipment to meet current requirements. The project included process programming of batching kettles and CIP as well as packaging line integration and conveyor control.
Cybertrol designed and built a new control system, including:
Cybertrol leveraged experience with process and packaging equipment to provide a new control system that met throughput expectations. An updated safety system allowed for a more safe and flexible system for operators.